亚洲欧洲国产欧美一区精品,激情五月亚洲色五月,最新精品国偷自产在线婷婷,欧美婷婷丁香五月天社区

      商務(wù)英語

      各地資訊

      當(dāng)前位置:考試網(wǎng) >> 商務(wù)英語 >> BEC中級(jí) >> 模擬試題 >> 2015年商務(wù)英語中級(jí)閱讀模擬練習(xí)4

      2015年商務(wù)英語中級(jí)閱讀模擬練習(xí)4

      來源:考試網(wǎng)   2014-12-24【

        l Read this memorandum.

        l Choose the best sentence from the list A – I to fill each of the blanks.

        l For each blank (8 - 12) mark one letter (A - I) on your Answer Sheet.

        l De not mark any letter twice.

        l One answer has teen given as an example.

        MEMORANDUM

        To: Filma Williams, school of Architecture

        From: Ram S. Johnson, Physical Plant Operations

        Subject: Air-conditioning Installation Costs for East Hall.

        Date: 4.4.94

        As you requested in your memo of March 15, we have studied the costs of installing air conditioning for the seven offices and two studio classrooms in East Hall ____ Example ____

        Office and Classroom installation

        Estimates were obtained from three contractors on the costs of covering the offices and classrooms ____ 8 ____ The work would take about three weeks.

        Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period ____ 9 ____ Sheet metal work to build out lest in the classes could be dine on weekends, and the overtime labour costs of about $ 1,500 have been included in the estimates.

        Arrangements were not made to do the office space installation on weekends … 10 …

        Additional Installation

        Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. ____ 11 ____ If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way ____ 12 ____

        Summary

        The total job for the building would be about $ 35,000 if done at one time. A two-stage installation would cost about $55,000. I can get official bids at your request.

        Example: A

        A. As you suggested, we also sought information on the additional cost of air conditioning in the entrance halls and stairways.

        B. All these three were in the $ 20,000 to $ 25,000 range.

        C. This later installation would cost about $20,000.

        D. However, class interruption should be minimal.

        E. In the same way, each of these three would take at least one month.

        F. Therefore, the total cost was this $6,000 plus another $5,000.

        G. Labour costs would be an additional S 5,000, bringing the total cost of the addition to $11,000.

        H. Each faculty member could expect to have workers in office for about one day.

        I. So faculty members can continue their office work as usual.

        參考答案:8.B 9. D 10. H 11. G 12. C

      責(zé)編:1511892766 評(píng)論 糾錯(cuò)

      報(bào)考指南

      報(bào)名時(shí)間 報(bào)名入口 報(bào)考條件
      考試時(shí)間 考試大綱 考試內(nèi)容
      成績查詢 等級(jí)劃分 成績?cè)u(píng)定
      合格證書 考試教材 備考指導(dǎo)

      更多

      • 考試動(dòng)態(tài)
      • 模擬試題
      • 歷年真題
      • 會(huì)計(jì)考試
      • 建筑工程
      • 職業(yè)資格
      • 醫(yī)藥考試
      • 外語考試
      • 學(xué)歷考試