l Read this memorandum.
l Choose the best sentence from the list A – I to fill each of the blanks.
l For each blank (8 - 12) mark one letter (A - I) on your Answer Sheet.
l De not mark any letter twice.
l One answer has teen given as an example.
MEMORANDUM
To: Filma Williams, school of Architecture
From: Ram S. Johnson, Physical Plant Operations
Subject: Air-conditioning Installation Costs for East Hall.
Date: 4.4.94
As you requested in your memo of March 15, we have studied the costs of installing air conditioning for the seven offices and two studio classrooms in East Hall ____ Example ____
Office and Classroom installation
Estimates were obtained from three contractors on the costs of covering the offices and classrooms ____ 8 ____ The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period ____ 9 ____ Sheet metal work to build out lest in the classes could be dine on weekends, and the overtime labour costs of about $ 1,500 have been included in the estimates.
Arrangements were not made to do the office space installation on weekends … 10 …
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. ____ 11 ____ If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way ____ 12 ____
Summary
The total job for the building would be about $ 35,000 if done at one time. A two-stage installation would cost about $55,000. I can get official bids at your request.
Example: A
A. As you suggested, we also sought information on the additional cost of air conditioning in the entrance halls and stairways.
B. All these three were in the $ 20,000 to $ 25,000 range.
C. This later installation would cost about $20,000.
D. However, class interruption should be minimal.
E. In the same way, each of these three would take at least one month.
F. Therefore, the total cost was this $6,000 plus another $5,000.
G. Labour costs would be an additional S 5,000, bringing the total cost of the addition to $11,000.
H. Each faculty member could expect to have workers in office for about one day.
I. So faculty members can continue their office work as usual.
參考答案:8.B 9. D 10. H 11. G 12. C
報(bào)名時(shí)間 | 報(bào)名入口 | 報(bào)考條件 |
考試時(shí)間 | 考試大綱 | 考試內(nèi)容 |
成績查詢 | 等級(jí)劃分 | 成績?cè)u(píng)定 |
合格證書 | 考試教材 | 備考指導(dǎo) |
初級(jí)會(huì)計(jì)職稱中級(jí)會(huì)計(jì)職稱經(jīng)濟(jì)師注冊(cè)會(huì)計(jì)師證券從業(yè)銀行從業(yè)會(huì)計(jì)實(shí)操統(tǒng)計(jì)師審計(jì)師高級(jí)會(huì)計(jì)師基金從業(yè)資格期貨從業(yè)資格稅務(wù)師資產(chǎn)評(píng)估師國際內(nèi)審師ACCA/CAT價(jià)格鑒證師統(tǒng)計(jì)資格從業(yè)
一級(jí)建造師二級(jí)建造師二級(jí)建造師造價(jià)工程師土建職稱公路檢測工程師建筑八大員注冊(cè)建筑師二級(jí)造價(jià)師監(jiān)理工程師咨詢工程師房地產(chǎn)估價(jià)師 城鄉(xiāng)規(guī)劃師結(jié)構(gòu)工程師巖土工程師安全工程師設(shè)備監(jiān)理師環(huán)境影響評(píng)價(jià)土地登記代理公路造價(jià)師公路監(jiān)理師化工工程師暖通工程師給排水工程師計(jì)量工程師
人力資源考試教師資格考試出版專業(yè)資格健康管理師導(dǎo)游考試社會(huì)工作者司法考試職稱計(jì)算機(jī)營養(yǎng)師心理咨詢師育嬰師事業(yè)單位教師招聘理財(cái)規(guī)劃師公務(wù)員公選考試招警考試選調(diào)生村官
執(zhí)業(yè)藥師執(zhí)業(yè)醫(yī)師衛(wèi)生資格考試衛(wèi)生高級(jí)職稱執(zhí)業(yè)護(hù)士初級(jí)護(hù)師主管護(hù)師住院醫(yī)師臨床執(zhí)業(yè)醫(yī)師臨床助理醫(yī)師中醫(yī)執(zhí)業(yè)醫(yī)師中醫(yī)助理醫(yī)師中西醫(yī)醫(yī)師中西醫(yī)助理口腔執(zhí)業(yè)醫(yī)師口腔助理醫(yī)師公共衛(wèi)生醫(yī)師公衛(wèi)助理醫(yī)師實(shí)踐技能內(nèi)科主治醫(yī)師外科主治醫(yī)師中醫(yī)內(nèi)科主治兒科主治醫(yī)師婦產(chǎn)科醫(yī)師西藥士/師中藥士/師臨床檢驗(yàn)技師臨床醫(yī)學(xué)理論中醫(yī)理論