PART TWO
Questions 8-12
Read this memorandum.
Choose the lest sentence from the list A-I to fill each of the blanks.
For each blank (8-12) mark one letter (A-I) on your Answer Sheet.
De not mark any letter twice.
One answer has teen given as an example.
MEMORANDUM
To: Filma Williams ,school of Architecture
From : Ram S. Johnson ,Physical Plant Operations
Subject : Air-conditioning Installation Costs for East Hall.
Date : 4.4.94
As you requested in your memo of March 15, we have studied the costs of installing air conditioning for the seven offices and two studio classrooms in Eest Hall ...example...
Office and Classroom installation
Estimates were obtained from three contractors on the costs of covering the offices and classrooms ...8...The work would take about three weeks.
BECause the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period...9... Sheet metal work to build out lest in the classes could be done on weekends , and the overtime labour costs of about $1,500 have been included in the estimates.
Arrangements were not made to do the office space installation on weekends `.. ... 10... ..
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways ,an additional $6 , 000 would be required for the equipment. .....11 ... If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way ...12...
Summary
the total job for the building would be about $ 35, 000 if done at one time. A two-stage installation would cost about $55 ,000. I can get official bids at your request.
Example: A
A As you suggested, we also sought information on the additional cost of air
conditioning in the entrance halls and stairways.
B All these three were in the $ 20,000 to $25,000 range.
C This later installation would cost about $20,000.
D However, class interruption should be minimal.
E In the same way, each of these three would take at least one month.
F therefore ,the total cost was this $6 ,000 plus another $5,000.
G Labour costs would be an additional S 5 ,000,bringing the total cost of the addition to $11 ,000.
H Each faculty member could expect to have workers in the office for about one day.
I So faculty members can continue their office work as usual.
8. B 9. D 10. H 11. G 12. C
報(bào)名時(shí)間 | 報(bào)名入口 | 報(bào)考條件 |
考試時(shí)間 | 考試大綱 | 考試內(nèi)容 |
成績(jī)查詢 | 等級(jí)劃分 | 成績(jī)?cè)u(píng)定 |
合格證書 | 考試教材 | 備考指導(dǎo) |
初級(jí)會(huì)計(jì)職稱中級(jí)會(huì)計(jì)職稱經(jīng)濟(jì)師注冊(cè)會(huì)計(jì)師證券從業(yè)銀行從業(yè)會(huì)計(jì)實(shí)操統(tǒng)計(jì)師審計(jì)師高級(jí)會(huì)計(jì)師基金從業(yè)資格期貨從業(yè)資格稅務(wù)師資產(chǎn)評(píng)估師國(guó)際內(nèi)審師ACCA/CAT價(jià)格鑒證師統(tǒng)計(jì)資格從業(yè)
一級(jí)建造師二級(jí)建造師二級(jí)建造師造價(jià)工程師土建職稱公路檢測(cè)工程師建筑八大員注冊(cè)建筑師二級(jí)造價(jià)師監(jiān)理工程師咨詢工程師房地產(chǎn)估價(jià)師 城鄉(xiāng)規(guī)劃師結(jié)構(gòu)工程師巖土工程師安全工程師設(shè)備監(jiān)理師環(huán)境影響評(píng)價(jià)土地登記代理公路造價(jià)師公路監(jiān)理師化工工程師暖通工程師給排水工程師計(jì)量工程師
人力資源考試教師資格考試出版專業(yè)資格健康管理師導(dǎo)游考試社會(huì)工作者司法考試職稱計(jì)算機(jī)營(yíng)養(yǎng)師心理咨詢師育嬰師事業(yè)單位教師招聘理財(cái)規(guī)劃師公務(wù)員公選考試招警考試選調(diào)生村官
執(zhí)業(yè)藥師執(zhí)業(yè)醫(yī)師衛(wèi)生資格考試衛(wèi)生高級(jí)職稱執(zhí)業(yè)護(hù)士初級(jí)護(hù)師主管護(hù)師住院醫(yī)師臨床執(zhí)業(yè)醫(yī)師臨床助理醫(yī)師中醫(yī)執(zhí)業(yè)醫(yī)師中醫(yī)助理醫(yī)師中西醫(yī)醫(yī)師中西醫(yī)助理口腔執(zhí)業(yè)醫(yī)師口腔助理醫(yī)師公共衛(wèi)生醫(yī)師公衛(wèi)助理醫(yī)師實(shí)踐技能內(nèi)科主治醫(yī)師外科主治醫(yī)師中醫(yī)內(nèi)科主治兒科主治醫(yī)師婦產(chǎn)科醫(yī)師西藥士/師中藥士/師臨床檢驗(yàn)技師臨床醫(yī)學(xué)理論中醫(yī)理論